Grønnexus Group AS
Environmental intelligence

EPD & Digital Product Evidence

Environmental evidence for technology that matters. EPD development, product-family coverage and digital workflows, with evidence that remains useful after publication.

← Environmental intelligence

Grønnexus helps manufacturers and infrastructure businesses turn product, supplier and production information into structured environmental evidence.

We support the development of Environmental Product Declarations (EPDs), coordinate the independent-verification pathway, and help organisations manage the data and decisions behind their declarations.

Our focus is technology-intensive products and systems: critical power, cooling, servers, IT equipment, industrial machinery and manufactured products. For hosting and infrastructure operators, we provide a distinct service that connects equipment evidence with the environmental assessment of their infrastructure and services.

What we help you resolve

An environmental-information request can become a coordination problem involving sales, engineering, procurement, factories and suppliers. Our service is designed around the question your business needs answered, not around producing documentation for its own sake.

Your situationWhat Grønnexus helps establishThe practical benefit
A customer has requested an EPD.The applicable declaration route, the products to cover, available evidence and the work required.A defined response and delivery plan instead of an open-ended investigation.
We have many configurations.Which configurations can share a valid model and which need separate treatment.Better coverage without assuming that one declaration applies to everything.
The information is spread across several teams.A structured collection process, named data owners and traceable source records.Less repeated searching and reconciliation.
We already have EPDs, but products keep changing.Which changes affect models, published declarations and customer statements.A controlled update process rather than repeated emergency redevelopment.
We need to produce declarations repeatedly.Whether a reusable model or controlled generator is justified.Automation targeted at a demonstrated workload.
We operate infrastructure rather than manufacture products.How equipment evidence can support a separately scoped infrastructure or service assessment.Information relevant to your assets and services, without confusing them with equipment declarations.

Why this matters in technology and infrastructure markets

The demand for product-level evidence is visible in the sector.

July 2024

AWS, Digital Realty, Google, Meta, Microsoft and Schneider Electric jointly called for wider EPD adoption among data-centre suppliers (iMasons Climate Accord). This is a meaningful market signal, not a claim that every supplier faces the same contractual requirement.

March 2026

The Circular and Fair ICT Pact published a recommendation encouraging procurers to request third-party-verified EPDs for ICT hardware, to improve the quality of product-related emissions information used in procurement and reporting (Public Buyers Community).

Our sector focus

The following sectors are our main focus (not exhaustive).

AreaIllustrative scopePrincipal assessment questions
Critical-power equipmentUPS systems, switchgear, transformers, power distribution, battery systems, backup-power equipment.Which configuration is supplied? What is included? How are losses distributed, storage managed, maintenance scheduled, replacements planned and service life represented?
Cooling and thermal systemsCooling units, chillers, heat exchangers, coolant-distribution units, pumps, fans and associated assemblies.What function is delivered? Which fluids and refrigerants are included? What are the operating, leakage, maintenance and end-of-life assumptions?
Servers and IT equipmentServers, storage, networking equipment, racks, electronic assemblies, configurable computing systems.Which processors, memory, storage, power supplies and options are covered? What evidence supports component production and use?
Industrial machinery and manufacturing systemsMotors, drives, control equipment, machinery, production equipment and eligible assemblies.What service does the equipment deliver? How do duty cycle, throughput, maintenance and lifetime affect the assessment?
Manufactured products and componentsMetal, polymer, composite, fabricated and other industrial products.What materials, processes, suppliers, sites, allocation methods and product variations determine the inventory?
Hosting and digital infrastructureHosting operators, colocation providers, managed infrastructure, enterprise IT estates.How should equipment, energy, shared infrastructure, utilisation and service delivery be assessed without double counting?

The programme route is selected for the product, not simply for the sector label. Our approach is rooted in international standards and guidance, for example PEP ecopassport for electrical, electronic and HVAC equipment, the International EPD System's non-construction electronics PCR (which covers servers but excludes construction-classified products and electronic services), and ISO 14064, 14040/14044, 14025, 21930 and 14067. A hosting service is therefore not automatically assigned the same EPD route as a server.

The Grønnexus service portfolio

Seven services that can be combined, from a first readiness review to a maintained portfolio.

GNX-EPD-01

EPD Route & Readiness

Establish the right project before committing to the full study.

For: Manufacturers receiving a first request, entering a new market, or deciding which products to prioritise.

We review the customer requirement, nominated products, manufacturing locations, existing documentation and likely programme routes. We identify the information already available, the material gaps and the responsibilities needed to close them. Initial scope: one product family, one production site, one defined market or customer requirement, and a bounded list of product references.

You receive
A route recommendation, product-coverage assessment, prioritised data request and a scoped proposal for the substantive work.
Business value
Clarity on what is necessary, what can be reused, and what should not be commissioned yet.

Important boundary: This is not a completed LCA or verified declaration. Where the requirement and scope are already clear, we propose the main assignment directly, without an unnecessary preliminary study.

GNX-EPD-02

EPD & PEP Development

From engineering information to a declaration your customers can use.

For: Manufacturers needing a first declaration, a new product declaration, or an additional site or market route.

The assignment covers scope definition, structured data collection, lifecycle modelling, the required environmental calculations, the supporting report, declaration preparation, internal technical review, responses to independent-verifier findings and publication support. The model examines the required lifecycle stages, not only the factory's energy use or the product's material mass.

You receive
The agreed technical package, a managed independent-verification process, publication support, and a product-coverage and use guide.
Business value
A defined delivery process and a reusable evidence foundation for subsequent work.

Important boundary: Independent verification and programme acceptance are separate from development. We coordinate the process but do not promise a favourable verification conclusion or a publication date outside our control.

GNX-EPD-03

Product-Family & Multi-Site Programmes

Cover the products that matter, without rebuilding every calculation.

For: Manufacturers with multiple capacities, dimensions, configurations, formulations or production sites.

We establish a product-family matrix, identify environmentally significant differences, assess the permitted modelling approach, and define representative and boundary cases. For equipment, this can include variations in storage, electronics, enclosure, cooling, power rating, operating modes or included accessories. For manufactured products, it can include composition, dimensions, production routes, site utilities, yields and supplier differences.

You receive
A defensible coverage strategy, controlled family models, an explicit list of included and excluded configurations, and a phased declaration programme.
Business value
Targeted investment in commercially relevant coverage and less unnecessary duplication.

Important boundary: Commercial similarity does not establish environmental representativeness. A catalogue range is not automatically one EPD family, and a simple average across sites is not automatically acceptable.

GNX-EPD-04

Digital EPD Workflows & Generators

Automate repeated handling without removing technical control.

For: Manufacturers with a repeatable declaration workload and sufficient product-family stability.

We design a bounded implementation around approved data structures, model parameters, calculation rules, user roles, validation checks and reporting outputs. The project may include structured imports from engineering or production systems, reusable product models, report generation, controlled customer interfaces and change notifications. We begin with a controlled model and a proven internal workflow, and introduce customer-facing automation only where the technical scope, licensing, economics and assurance route support it.

You receive
The agreed implementation, reference tests, operating instructions, user training, version controls, and support for independent tool assessment.
Business value
Repeatable handling of eligible products and fewer manual transfers between disconnected files.

Important boundary: An EPD generator is not automatically authorised for unattended publication. Programme arrangements differ: the International EPD System distinguishes tools that simplify individual verification from tools that can replace it with an annual verification procedure under specified conditions.

GNX-EPD-05

EPD Portfolio Care

Keep product evidence applicable as your business changes.

For: Organisations managing existing declarations or expanding their portfolio.

We maintain an agreed register of products, configurations, declarations, source evidence, responsible persons, validity dates and change triggers. Support can include periodic reviews, renewal planning, bounded customer-documentation requests, supplier-data follow-up, and screening of engineering or manufacturing changes.

You receive
An organised portfolio, visible responsibilities, an update schedule and a nominated service lead.
Business value
Continuity after publication and less repeated rediscovery when products or personnel change.

Important boundary: This service does not automatically extend declaration validity. Major changes, new products and substantive recalculation are scoped separately where applicable.

GNX-EPD-06

Refurbished Equipment Evidence

Make second-life products easier to assess and document.

For: Equipment refurbishers, original equipment manufacturers, asset-recovery businesses and suppliers of refurbished electrical or IT equipment.

We establish the relevant assessment route and collect evidence on incoming equipment, inspection, refurbishment operations, replaced parts, testing, logistics, expected service and end-of-life treatment. The route must distinguish refurbishment from repair, reuse and remanufacturing where those distinctions affect the rules. PEP ecopassport introduced dedicated guidance for refurbished electrical, electronic and HVAC equipment in 2026, and we have adopted it in our specialist offer, together with our own in-house methodology based on the latest science.

You receive
A defined methodological route, evidence requirements, the agreed assessment, and declaration-development support where an applicable route is confirmed.
Business value
A documented basis for customer evaluation, rather than a generic assumption that “second-life” automatically means lower impacts.

Important boundary: Applications evolve product family by product family, so not every refurbished product already has a straightforward approved route.

GNX-EPD-07

Hosting & Infrastructure Environmental Evidence

A complementary service, not automatically an EPD.

For: Hosting businesses, colocation providers, managed-service providers and enterprise infrastructure owners.

We connect available equipment evidence with a separately defined assessment of the infrastructure or service. The assignment can include the asset inventory, applicable equipment declarations, operational energy, shared-facility inputs, replacements, service definition, allocation and uncertainty. ITU-T L.1410 provides a methodology for lifecycle assessment of ICT goods, networks and services; a service EPD is only offered once an applicable programme and product-category route has been established.

You receive
An evidence register, a documented assessment method, results for the agreed scope, limitations and customer-use guidance.
Business value
A more defensible answer to customer questions about the infrastructure or service they purchase.
What we explicitly control:
  • Service definition: a rack-month, reserved server-month or compute unit must specify what is delivered. Labels alone do not establish equivalent service.
  • Shared-resource allocation: an agreed, supportable method, rather than dividing everything by an arbitrary customer count.
  • Energy boundaries: a server EPD's prescribed use scenario is not added to measured operating energy that represents the same activity.
  • Equipment versus service claims: a product EPD does not certify the entire data centre, cloud service or hosting business.

Four reasons to choose Grønnexus

Evidence matched to the configuration being sold

Each assignment identifies the product references, options, sites and conditions covered by its outputs. For a server, changing memory, processors, storage or power supplies is treated as a coverage question. For a UPS, capacity and battery configuration are not reduced to a single generic product name.

Customer benefit

Commercial teams know what evidence they may use for the actual quotation.

Two distinct views: declaration and decision

We keep the prescribed declaration calculation separate from engineering or actual-use scenarios. The published declaration follows its approved basis; separate decision studies can examine different operating conditions, maintenance plans, suppliers or design changes without silently rewriting that basis.

Customer benefit

One controlled foundation can support different decisions without confusing their status.

A clear explanation when results change

Updates distinguish changes caused by the product or manufacturing system from changes caused by databases, methods or scenarios. A reduction arising from a methodological update is not presented as an engineering achievement.

Customer benefit

A more trustworthy explanation for customers, management and product teams.

Technology that serves the evidence process

Automation should reduce repeated entry, identify inconsistent units, preserve versions and generate outputs from controlled results. It should not invent missing supplier information or make unreviewed methodological decisions.

Customer benefit

Less repetitive handling without weakening accountability.

The customer handover: a Declaration Use Pack

The declaration should be accompanied by information that makes it usable.

Handover componentCustomer use
Product-coverage mapIdentify the exact references, configurations and sites covered.
Declaration and supporting-report accessRetrieve the agreed outputs under the contractual confidentiality and licence conditions.
Structured results and interpretation notesUnderstand units, lifecycle scope, scenarios, exclusions and permitted applications.
Evidence and version recordIdentify the data period, calculation baseline, review status and source of each release.
Change and renewal guideKnow when to notify Grønnexus and what might require reassessment.

This is a supplementary package, not a new certification, an EPD substitute or a digital product passport.

How we deliver

Engaging with us is simple and frictionless.

#PhaseWork performedAgreed completion point
1DefineConfirm the customer requirement, products, sites, programme route, deliverables and responsibilities.A scoped assignment with unresolved questions identified.
2CollectOrganise product, supplier and production evidence; assess quality and gaps.An accepted data baseline or an explicitly agreed resolution plan.
3ModelBuild and document the lifecycle model, scenarios, calculations and interpretation.Reproducible results that pass internal technical checks.
4ReviewPrepare the report and declaration; complete internal review.A package ready for the applicable independent assessment.
5Verify and publishCoordinate independent review, address findings and support submission.Formal status and published output confirmed where achieved.
6MaintainHand over, train nominated users, and manage agreed changes and renewals.Clear ownership of the continuing portfolio.

Start with one product family

A useful first discussion needs only:

  • A representative specification
  • The nominated products
  • Manufacturing locations
  • Existing environmental documentation
  • The actual customer or market requirement

We then determine whether the right assignment is a full declaration, a family extension, an update, an automation project or a bounded readiness assessment.

Bring the product.Bring the requirement.We will define the evidence pathway.

Request an EPD readiness review

References

  • ISO 14025: Environmental labels and declarations, Type III environmental declarations
  • iMasons Climate Accord: joint call for EPD adoption among data-centre suppliers (July 2024)
  • Circular and Fair ICT Pact / Public Buyers Community: recommendation on third-party-verified EPDs for ICT hardware (March 2026)
  • PEP ecopassport: guidance for refurbished electrical, electronic and HVAC equipment (2026)
  • EPD International: General Programme Instructions and EPD tool verification
  • ITU-T L.1410: lifecycle assessment of ICT goods, networks and services (2024)